摘要:河溪梁桥设计为20的预应力混凝土简支箱形梁桥。该桥采用双车道布置。上部为装配式部分预应力混凝土简支箱梁。为降低主梁高度,减少预应力引起的上拱度,后张法预应力混凝土箱梁在设计荷载下按部分预应力混凝土A类构件设计,主梁配筋采用预应力筋和非预应力筋混合配筋。下部桥墩为钢筋混凝土圆形双柱式墩;桥墩基础为单排双列钻孔灌注桩基础。桥墩盖梁为连续墩盖梁,按简支梁计算盖梁内力及墩柱顶竖向反力。桩基采用为单排桩形式。
关键词:箱梁;后张法;预应力混凝土
ThedesignoftheHeXibridge
Author:XXX
(XXX,611830)
Instructor:XXX
Abstract:Theprogramof Hexi designfor20mpre-stressedconcretefreesupportedboxgirderbridge.ThisbridgehasTwodriveway.Theupsideofbridgeisthetypeofassemblypartialprestressedreinforcementconcretesimpleunderpropboxgirder.Inordertoreducethegirder’stallness,reducethesuperiorcamberwhichthepre-stressedcauses,theposttenioningpre-stressedconcreteboxgirderunderthedesignedloadisdesignedaccordingtotheparticalpre-stressedconcreteAmember,thegirderadoptthemixedcomplexofthepre-stressedreinforcingsteelbarandthenon-pre-stressedreinforcingsteelbar.Thepierofthebridge’sInfrastructureisthereinforcedconcretecirculardistylepillar;Pier’sbedrockforsinglelinedoublerowdrillholeirrigationpilefoundation.Bridgepierplategirderiscontinualpierplategirderwhichcalculatesplatepier’sinternalforceandthepier’stopverticalforceaccordingtothesimplebeam.Pilefoundationusethesinglepilingform.
Keywords: Boxgirder; Posttensioningconcrete; Prestressedconcrete
关键词:箱梁;后张法;预应力混凝土
ThedesignoftheHeXibridge
Author:XXX
(XXX,611830)
Instructor:XXX
Abstract:Theprogramof Hexi designfor20mpre-stressedconcretefreesupportedboxgirderbridge.ThisbridgehasTwodriveway.Theupsideofbridgeisthetypeofassemblypartialprestressedreinforcementconcretesimpleunderpropboxgirder.Inordertoreducethegirder’stallness,reducethesuperiorcamberwhichthepre-stressedcauses,theposttenioningpre-stressedconcreteboxgirderunderthedesignedloadisdesignedaccordingtotheparticalpre-stressedconcreteAmember,thegirderadoptthemixedcomplexofthepre-stressedreinforcingsteelbarandthenon-pre-stressedreinforcingsteelbar.Thepierofthebridge’sInfrastructureisthereinforcedconcretecirculardistylepillar;Pier’sbedrockforsinglelinedoublerowdrillholeirrigationpilefoundation.Bridgepierplategirderiscontinualpierplategirderwhichcalculatesplatepier’sinternalforceandthepier’stopverticalforceaccordingtothesimplebeam.Pilefoundationusethesinglepilingform.
Keywords: Boxgirder; Posttensioningconcrete; Prestressedconcrete